The use of boreholes for the infiltration of treated effluent - Pearly Beach Waste Water Treatment Works - A case study.
A Waste Water Treatment Works (WWTW) is being constructed at Pearly Beach. A geohydrological assessment was conducted to assess the potential discharge of treated effluent above and below the subsurface calcrete layers. A hydrocensus has been completed of the area to confirm there is no use of groundwater down-gradient of the WWTW and there is no likely impact on ecosystem functioning. Based on existing boreholes, infiltration above the calcrete layer in the vadose zone was found to be more efficient.