Development Of The Evander Goldfields 3-D Mine Void Model

POSTER The Evander Goldfield basin has been mined since the early 1950s at depths between 400 and 2 000 m below ground and is detached from the larger Witwatersrand basin. The assessment and prediction of mine water rebound has become increasingly important for the gold mining industry in the Witwatersrand basin as more mine shafts mothballs and dewatering ceases. The development of a  3-D  mine  void  model  is  crucial  in  predicting  the  rate  of  flooding  as  the  prediction  of  the groundwater rebound is primarily driven by the volumes of mine voids along with the amount of recharge. All available mine plan data for the Evander Gold Mine (EGM) were obtained digitally from Harmony Gold. However, the majority of the old mine workings (e.g. Leslie and Winkelhaak) were available  as  2-D  data  and  elevations  of  the  mine  developments  (stopes  and  drives)  had  to  be captured from hardcopy plans. Data from the more recent mining operations (e.g. Shaft 6), including updated survey and mine plan data, were directly used for the development of the 3-D void model. The calculated mine void volume, based on the EGM operations mine plan data, is approximately 80 518 045 m3. The mine void calculations were checked against the total tons of rock milled by the EGM operations since the late 1950s and was considered valid estimations of the EGM mine void volume. The validated EGM 3-D mine workings plan was subsequently used to determine the stage- volume relationships. The 3-D mine void model established, will then be incorporated into a regional numerical groundwater flow model to be calibrated against observed abstractions and water levels and utilised to predict future dewatering rates.

Presenter Name
Martin
Presenter Surname
Holland
Area
The Evander Goldfield, Mpumalanga
Conference year
2013